Final lining cross-sectional area: 24.6 square meters – 400 tons of steel rib supports installed at intervals of 0.5 to 1 meter using IPE180 and IPE200 sections
Maximum tunnel overburden: 108 meters
Total forepoling length: 5,500 linear meters
Total excavation volume: 26,000 cubic meters
Project Location
East Azerbaijan
Client
Technical and Engineering Services Company of Industries and Mines (Kani Mes)