Preparation and Execution of Slope and Trench Stabilization Works Overlooking the Construction Site of Phase 3 Sungun Copper Concentration Plant

Preparation and execution of slope and trench stabilization works overlooking the construction site of Phase 3 of the Sungun Copper Concentration Plant (Area 2, Trenches 8 to 17)

  • More than 60,000 linear meters of nailing with 25 mm diameter
  • 53,000 square meters of shotcrete
  • 50,000 cubic meters of trench excavation and earthworks
  • 60,000 cubic meters of concrete works

Project Location

East Azerbaijan

Client

Technical and Engineering Services Company of Industries and Mines (Kani Mes)