Sepehr Project – Rasht

Method:
Design and execution of Deep Soil Mixing (DSM) and Jet Grouting columns.

Project Specifications:

  • Column diameter: 80 cm

  • Column length: 13 to 16 meters

  • Total executed length: 13,000 linear meters

Key Challenges:

  • Considering soil–structure interaction through simultaneous modeling of the structure and the soil beneath the foundation

  • Assessing the settlement effects of adjacent structures on one another

  • Performing drainage operations below the groundwater level