Phase 3 Copper Concentration Plant Conveyor Tunnel Construction Project – Sungun Copper Mine

Method:

  • Tunnel excavation using the SEM (Sequential Excavation Method)

Project Specifications:

  • Tunnel length: 600 meters
  • Excavation cross-section area: 41.5 square meters
  • Portal dimensions: 7.15 × 6.39 meters
  • Final lining cross-section area: 24.6 square meters
  • Maximum tunnel overburden: 108 meters
  • Total excavation volume: 25,000 cubic meters
  • Forepoling operations: 5,500 linear meters

Major Challenges:

  • Execution of operations in unstable and collapsing soil conditions.

Project Location

East Azerbaijan

Client

Sungun Copper Mine

Project Image Gallery