Meygun Project

Method:
Excavation and stabilization of the excavation walls using Strut Support and Anchorage systems.

Project Specifications:

  • Excavation depth: 21 meters

  • Site / wall area: 2,000 square meters

Key Challenges:

  • Presence of a five-story building adjacent to the excavation

  • Challenging geotechnical conditions, with highly loose and unstable soil caused by extensive weathering

  • Presence of approximately 4 meters of artificial fill